New Fieldhouse Scoreboard

A new scoreboard was developed in the fieldhouse with better video and graphics.
| Architect: | Contractor: |
|---|---|
| Bridger Engineering, Inc. | Signco |

A new scoreboard was developed in the fieldhouse with better video and graphics.
| Architect: | Contractor: |
|---|---|
| Bridger Engineering, Inc. | Signco |
Montana State University
PO Box 172760
Bozeman, MT 59717-2760
Tel: 406 994-5413
Location: Plew Building, 516 W Grant St
Grant Petersen